Asphalt Driveway Cost Calculator
Price new, replacement or resurfacing jobs line by line.
Estimate your driveway
Every default price is shown under Your prices. Type in the lines from your quote.
Your prices and extra
Replace each default with a line from your quote. A blank box counts as $0.
$6.60 per ft² for 400 ft² · asphalt is 32% of it
One national cost guide (HomeGuide) puts a new asphalt driveway at $3–$7 per ft². This estimate is inside that band.
8 tons is a small job. Many pavers add a minimum charge; ask for it and enter it under Your prices.
How it’s calculated
Every step uses the numbers you entered above.
Area in square feet
Tons of hot mix to order
Asphalt line
Square-foot lines
Gravel base in tons
Total and cost per square foot
Asphalt driveway cost per square foot
Any asphalt driveway cost calculator starts from the square-foot price: one national cost guide puts a new drive at $3–$7 per ft² installed, another at $7–$13. The calculator above shows every price it uses, so you can see which band your job fits. The type of job and your local prices move the total more than any average does.
| Job | Cost per ft² (cost guides) | What it covers |
|---|---|---|
| New driveway | $3–$7 (HomeGuide); $7–$13 (Inch Calculator) | Gravel base, asphalt, labor |
| Replacement | $4–$10 (HomeGuide, repave with new base); $8–$15 (Inch Calculator) | Tear-out, new base, new asphalt |
| Resurfacing | $1–$3 | 1½–2 in of new surface on a sound base |
| Mill and overlay | $1.25–$3.75 | Grind off the top, then overlay (the calculator has no milling line) |
| Tear-out only | $1–$3 | Remove and haul away the old driveway |
These are cost-guide ranges, not set prices. Use them to see whether a quote’s price per ft² falls inside the band for its type of job.
The asphalt itself is only about a third of a new driveway. Labor, equipment and the gravel base carry most of the price. That is why a thinner mat saves less than you might expect.
Asphalt cost per ton starts at the plant. A Mississippi statewide agency contract for July–December 2025 listed hot mix at about $75–$122 per ton. Haul was extra: $0.30–$1.00 per ton per mile, with a minimum of $10–$20 per ton.
Those are contract prices for public agencies. A homeowner buys through the paver. One cost guide puts the material at $100–$200 per ton.
Each inch of compacted asphalt weighs about 12 lb per square foot, or 0.006 ton. At $105 per ton delivered, an inch costs about $0.63 per square foot before labor. If your supplier quotes by volume, a compacted cubic yard of hot mix is about 1.96 tons; see cubic yards to tons of asphalt.
Asphalt driveway cost by size
A new 20 × 20 ft asphalt driveway costs about $2,640 at this calculator’s default prices. Replacing an old one that size costs about $3,440, and resurfacing it costs about $978.
| Size | Tons | New | Replace | Resurface |
|---|---|---|---|---|
| 10 × 20 ft | 3.6 / 4 | $1,320 | $1,720 | $515 |
| 12 × 24 ft | 5.2 / 5.5 | $1,874 | $2,450 | $708 |
| 20 × 20 ft | 7.2 / 8 | $2,640 | $3,440 | $978 |
| 24 × 24 ft | 10.4 / 11 | $3,747 | $4,899 | $1,364 |
| 20 × 40 ft | 14.5 / 15.5 | $5,228 | $6,828 | $1,903 |
| 1,000 ft² | 18.1 / 19.5 | $6,548 | $8,548 | $2,365 |
| 1,500 ft² | 27.2 / 29 | $9,795 | $12,795 | $3,548 |
| 2,000 ft² | 36.2 / 38.5 | $13,043 | $17,043 | $4,678 |
How the table is built:
- New and replace: 3 in of compacted asphalt on a 4 in gravel base. Tons are for new and replace jobs.
- Resurface: 2 in of compacted asphalt, no new base.
- Asphalt: $90 per ton at the plant plus $15 per ton haul.
- Labor: $2.50 per ft², or $1.00 for resurfacing.
- Base and tear-out: $2.00 per ft² each.
- Tons column: net tons / tons to order. Order = net tons plus 5% extra, rounded up to the next ½ ton. For resurfacing tons, set the calculator to Resurface.
- No minimum charge or permit is included. Tons are short tons (2,000 lb) of compacted hot mix.
Rows under about 10 tons are small jobs. Many pavers add a minimum charge to those, so the real price per square foot is usually higher than the table shows. Ask for the minimum and add it in the calculator.
Long driveways: cost per linear foot
For a long driveway, multiply length × width × cost per square foot. A new drive at the default prices costs about $65 per foot of length at 10 ft wide and $78 at 12 ft wide. That assumes 3 in of compacted asphalt on a 4 in base.
- 100 ft × 10 ft: about $6,548
- 100 ft × 12 ft: about $7,815
- 300 ft × 12 ft: about $23,445
- 400 ft × 12 ft: about $31,208
The widths are examples, so measure yours. The Virginia Asphalt Association gives 8 ft as the minimum width for one car. Long drives often need culverts, extra grading or a turnaround, and each of those is a separate line on the quote.
Asphalt driveway thickness by soil
Yes, 3 in of compacted asphalt is the usual minimum when it sits on a compacted gravel base. That base should be 4 in on fair or good soil and 6 in on poor soil, according to the Colorado Asphalt Pavement Association. All thicknesses on this page are compacted.
| Subgrade soil | Asphalt over gravel base | Full-depth asphalt |
|---|---|---|
| Poor | 3 in on 6 in | 5½ in |
| Fair | 3 in on 4 in | 4½ in |
| Good | 3 in on 4 in | 4½ in |
The Virginia Asphalt Association treats 4 in of crushed aggregate as the absolute minimum base. The Illinois Asphalt Pavement Association says 4 in of full-depth asphalt may be adequate, but 5–6 in builds a stronger drive. You can size the base stone with the gravel calculator.
For resurfacing, an overlay of 1½–2 in of surface mix is typical. Holes and cracks get patched before it goes down.
Going thicker adds about 0.006 ton of asphalt per square foot for each inch. At $105 per ton delivered, that is about $0.63 per square foot of material, and labor changes little. A 20 × 20 drive at 4 in instead of 3 in adds 2.5 tons to the order, about $263.
Checking a paving quote
To check a quote, put its own numbers into the calculator: tons, price per ton, base depth, tear-out and any minimum. Then compare the price per square foot with both cost-guide ranges above. When a quote falls outside both ranges, the gap usually traces to one line.
Here is an example. A paver quotes $4,600 to replace a 20 × 20 driveway with 3 in of asphalt on a 6 in base.
- The calculator at its default prices, with a 6 in base, gives 8 tons and about $3,840, or $9.60 per ft².
- The quote works out to $11.50 per ft².
- That is above HomeGuide’s $4–$10 range for repaving with a new base.
- It is inside Inch Calculator’s $8–$15 range for replacement.
Ask which line is higher than the defaults: labor, base or tear-out.
Five questions to ask the paver:
- Is the thickness compacted, and how many tons do you plan to place? Tons worked out from compacted thickness at 145 lb per cubic foot already allow for the roller, so do not add a second allowance.
- How deep is the gravel base after compaction, and will you compact the soil under it?
- What slope will the surface have? Ask for at least ¼ in per foot so water runs off.
- Is there a minimum job charge, and is haul included in the price per ton?
- Does the price include a permit where one is needed? One cost guide puts a driveway permit at $50–$150.
An asphalt paving cost calculator is only as good as the prices you give it. Get these answers from two or three pavers near you, and enter each quote separately.
Asphalt driveway FAQ
Is asphalt cheaper than concrete for a driveway?
Usually. One cost guide puts asphalt at $3–$7 per ft² and plain concrete at $4–$8 per ft². For the concrete side, see concrete driveway cost.
How many tons of asphalt does a driveway need?
Multiply square feet × compacted inches ÷ 12 × 145 ÷ 2,000; the calculator above does this for you. For tons by area and coverage per ton, use the asphalt calculator.
When should a new asphalt driveway be sealed?
Not until it is several months old. After that, the Colorado Asphalt Pavement Association suggests a sealer every 2–5 years.
Should I resurface or replace my asphalt driveway?
Resurface only when the base under the old drive is still sound, and patch holes and cracks first. If the drive is breaking up because the base has failed, an overlay will not fix it. Run both jobs in the calculator to see the price gap.