What a yard of concrete costs

Cost guides put a yard of standard ready-mix concrete at about $120 to $195 in 2026. Your local plant’s quote is the only exact number. It depends on where you live, the mix and the fees on your ticket.

The guides disagree on the ready-mix concrete cost per yard because they count different things. One puts the price at $120 to $150 a yard, with delivery within about 20 miles. Another gives $160 to $195 as a national range. There is no official government price per yard for ready-mix, so every average you see comes from a survey.

What the government does track is the trend. The producer price index for ready-mix concrete was about 2.4% higher in October 2026 than a year earlier. It was about 31.5% higher than five years earlier. That index shows direction, not dollars.

If you are searching for the cost of a “yard of cement,” you most likely mean concrete. Cement is one ingredient in it, and plants sell the finished mix by the cubic yard. To turn your slab or post holes into cubic yards to order, use the concrete calculator.

What raises or lowers the concrete cost per yard

Strength, add-ins, timing, distance and order size explain most of the gap between two quotes. A 4,000 or 5,000 psi mix costs more per yard than a lower-strength mix. Most extras are added to the base price per yard. Ask for each one by name.

Your real price per yard is the base price for your mix plus every adder charged per yard. Write that number down for each plant before you compare them.

Delivery and short-load fees on a ready-mix ticket

Besides the yards, a ticket can carry delivery, short-load, unloading-time and other charges. A ready-mix truck carries about 8 to 12 cubic yards, according to the NRMCA ordering guide. An order below a plant’s full-load line is a short load, and it can carry a short-load fee.

For example, one Minnesota producer’s 2026 dispatch guidelines add a part-load charge to loads of 6¼ cubic yards or less. Some plants charge this as one flat fee. Others charge it for each yard you are short of the line.

Time on site costs money too. That same producer allows 7 minutes per cubic yard to unload. After that, it bills $200 an hour. Have your forms, tools and helpers ready before the truck arrives.

Delivery is often a separate line, so your concrete cost per yard delivered can be higher than the quoted price. Call two or three plants and ask each one the same questions:

  1. What is the price per cubic yard for my mix and psi?
  2. Where is your short-load line, and is the fee flat or per yard?
  3. What is your minimum order, and in what steps do you sell?
  4. How many unloading minutes are included before time charges start?
  5. What delivery, fuel, environmental or weekend charges will be on my ticket?

Then add each plant’s answers into one total. The lowest price per yard is not always the lowest ticket. When the ticket arrives, check the yards, mix, psi and each fee against the quote.

How to price your concrete order

Your concrete cost is the yards you order times the price per yard, plus the short-load fee and any other ticket charges:

Cost = yards to order × price per yard + short-load fee + other charges

Start from the plan volume, then order 4% to 10% more, as NRMCA advises. Round up to the plant’s order step. Some sell in ¼ yards, while others sell in ½ or whole yards on small orders.

At 4 inches thick, one cubic yard covers 81 square feet before any extra. At 6 inches, it covers 54 square feet.

The examples below use 10% extra and round up to the next ¼ yard, like the calculator linked above.

Patio 10 × 10 ft, 4 in

1.23 yd³ plan, 1.36 yd³ with 10% extra. This is a short load at almost any plant.

1.5 yd³ to order

Slab 12 × 12 ft, 4 in

1.78 yd³ plan, 1.96 yd³ with 10% extra. Ask about the short-load fee.

2 yd³ to order

Slab 20 × 20 ft, 4 in

4.94 yd³ plan, 5.43 yd³ with 10% extra. That is still under the 6¼ yd³ part-load line at the producer above.

5.5 yd³ to order

Driveway 20 × 30 ft, 6 in

11.11 yd³ plan, 12.22 yd³ with 10% extra. This likely means two trucks, so ask whether the smaller second load carries a short-load fee.

12.25 yd³ to order

Bigger slabs follow the same steps. A 30 × 30 ft slab at 4 inches comes to 12.25 cubic yards to order. A 40 × 60 ft slab at 4 inches comes to 32.75 cubic yards.

These totals cover the concrete only. Labor, forms and finishing for an installed slab are a separate question.

Bagged concrete vs a ready-mix truck

For about a yard or less, bags often cost less, but only a side-by-side total tells you. Price both ways for the same job, with the same 10% extra:

  • Bags: plan yd³ × 1.10 × 45, rounded up, × your price per 80 lb bag
  • Truck: yards to order × price per yard + short-load fee + other charges

The 45 comes from the bag. An 80 lb bag of concrete mix makes about 0.60 cubic feet, according to the Quikrete data sheet. A cubic yard is 27 cubic feet, and 27 ÷ 0.60 gives 45 bags for one exact yard. With 10% extra, it takes 50.

Take the 10 × 10 ft patio from above. Bags come to 62 bags of 80 lb times your bag price. The truck comes to 1.5 yd³ times your price per yard, plus the short-load fee and other charges. Whichever total is lower wins on money.

Money is not the whole cost of bags. Weigh these before you choose:

  • Weight to haul: 45 bags of 80 lb weigh 3,600 lb dry, before you add water. Scale that to your own bag count, and check the payload on your truck’s door sticker before you load it.
  • Mixing time: every bag is mixed by hand or in a rented mixer, and the first batches start to set while you mix the rest.
  • Finished weight: placed concrete weighs about 4,050 lb per cubic yard once it is mixed with water.

Concrete price per yard FAQ

What is the concrete cost per yard delivered?

It is the plant’s price per yard plus whatever delivery charges it adds. Some cost guides quote prices with delivery inside a set distance, and others quote the concrete only. Ask each plant whether delivery is in the price or on a separate line.

How much is a 10-yard truck of concrete?

Expect about 10 times your price per yard, plus any delivery charges. Ten yards is close to a full load at many plants, so it may avoid a short-load fee. Confirm the plant’s truck size and full-load line when you call.

How much is a yard of concrete per square foot?

At 4 inches thick, divide the price per yard by 81 to get the material cost per square foot. At 6 inches, divide by 54. Those figures have no extra built in, so add your 10% on top.

How much does half a yard of concrete cost?

Half a yard takes 23 bags of 80 lb mix. With 10% extra, it takes 25. Multiply that count by your bag price.

A truck for half a yard is a short load at most plants. Many plants will not send less than a yard, or they set a minimum. One producer recommends at least 2 cubic yards for air-entrained concrete.