What a yard of dirt costs
Cost guides answer how much is a yard of dirt with two ranges: about $5–25 per cubic yard for common fill dirt and about $10–40 for topsoil. Those are prices for the dirt alone. Most suppliers add delivery as a separate charge per trip.
| Dirt type | Material price per cubic yard (delivery separate) | What it’s for |
|---|---|---|
| Fill dirt | $5–20 | Raising grade, filling holes and low spots |
| Clean fill (no debris) | $8–25 | Fill where debris isn’t allowed |
| Structural fill | $10–30 | Graded fill for load-bearing work |
| Unscreened topsoil | $10–35 | Lower layers under a lawn or bed |
| Screened topsoil | $20–40 | New lawns, seeding, top layers of beds |
| Black dirt | $15–25 | Dark topsoil sold in some regions |
| Landscape mix or planting soil | $25–50 | Garden beds; a blend, not plain topsoil |
Published ranges disagree. Other cost guides list fill dirt cost per yard as low as $5–15 and screened topsoil as high as $55–60. Some fold delivery into the yard price and some don’t. Prices are also local, so treat any range here as a starting point for a quote.
How much does a yard of dirt cost for your job also depends on order size: a 2-yard order usually costs more per cubic yard than a 10-yard order. If you’re pricing a yard of soil for garden beds, use the planting soil row, not the topsoil rows.
Fill dirt vs topsoil cost per yard
Fill dirt usually costs about half as much as topsoil per cubic yard. Roots only need topsoil in the top layer, so buy fill for the deep part and topsoil for the top. Paying topsoil prices to fill a deep hole is a common way to overspend.
- Fill dirt is subsoil with little organic matter. It raises grade and fills holes and low spots. Clean fill has no debris, and structural fill is graded for load-bearing work, so it costs more.
- Topsoil is the upper, organic layer. Screened topsoil costs more than unscreened because the clods, roots and rock have been removed.
- Black dirt is a regional name for dark topsoil. Ask the supplier what is in it before you order.
A new lawn needs at least 4 to 6 inches of topsoil, measured after it settles, according to Penn State Extension. The Connecticut Agricultural Experiment Station recommends a minimum of 6 inches. Below that layer, fill dirt does the job.
Here is how the split changes the bill, using example prices from the middle of the ranges above. Raising a 20 × 20 ft area by 12 inches takes about 15 cubic yards in place (20 × 20 × 1 ÷ 27 = 14.8).
| Plan | What you order | Math | Cost before delivery |
|---|---|---|---|
| Fill under topsoil | 13 yd loose fill + 5 yd screened topsoil | 13 × $15 + 5 × $30 | $345 |
| All topsoil | 15 yd screened topsoil | 15 × $30 | $450 and up |
The 13 yards of fill covers 10 compacted yards plus the extra explained in the pricing section below. Two materials can mean two deliveries, so ask whether both fit on one truck. The all-topsoil plan also needs extra for settling, which pushes it past $450. The fill dirt calculator page compares the two materials in more detail.
Delivery fees, minimums and dump truck loads
A yard of dirt delivered costs the material price plus about $50–150 per trip. Cost guides put a full truckload of fill dirt at about $150–400 with delivery included.
| Truck | Typical bed size |
|---|---|
| Small single-axle dump truck | 6–8 cubic yards |
| Tandem-axle dump truck | 8–12 cubic yards |
| Tri-axle or quint-axle dump truck | 12–15 cubic yards |
Those are volumes. Dirt is heavy, so a truck often reaches its weight limit before its bed is full. The supplier decides how many yards of dirt go on one load.
The fees you’re likely to see:
- A flat delivery charge of $50–150 per trip is common.
- Other suppliers charge $50–100 per hour instead.
- Some add a charge per mile past a set distance.
- Many set a minimum order, often 2 cubic yards. A few want 10–20 yards before delivery is free or flat-rate.
- Rough spreading after the truck dumps costs about $200–400 if you hire it.
The $150–400 fill truckload price is for a load described as about 10–14 cubic yards, within about 10 miles. A topsoil truckload runs $150–500 for 10–15 yards, within about 30 miles. Ask how many yards your load really holds.
A search for dirt near me turns up suppliers, not a sourced price list by state or city. Call two or three local supply yards and ask each one:
- Do you price by the yard or by the ton? If by the ton, what weight per yard do you use?
- What is the delivery fee, and what is the minimum order?
- What size truck do you send, how many yards fit per load, and how many trips will my order take?
- Is the topsoil screened or unscreened? Is the fill clean, with no rock, concrete or roots?
- Where can the truck dump, and does spreading cost extra?
How to price your dirt order
Your total is the yards you order times the price per yard, plus delivery for each trip, plus spreading if you hire it. Fill that will be compacted needs extra loose yards on top of what the hole measures.
Total = yards to order × price per yard + delivery per trip × trips + spreading
Get your yards first from the fill dirt calculator or the topsoil calculator for your own measurements.
For fill that you’ll pack down, the Penn State Center for Dirt and Gravel Roads materials calculator estimates 1.333 loose cubic yards for each compacted cubic yard. That is about one third more. Treat it as an estimate, since shrinkage depends on the soil and how hard it is packed, and ask your supplier.
Topsoil for beds and lawns is not machine-compacted, but it does settle. Order a little extra; the topsoil calculator includes a settling allowance.
These worked orders use example prices per cubic yard. Swap in your own quotes.
| Order | Yards to order | Math | Total before tax |
|---|---|---|---|
| A. Topsoil you haul yourself | 2 | 2 × $25 | $50 |
| B. Screened topsoil, delivered | 6 | 6 × $35 + $100 | $310 |
| C. Hole measuring 9 yd³, compacted | 12 loose | 9 × 1.333 = 12; 12 × $15 + $100 | $280 (one load) |
| D. Fill dirt, delivered | 10 | 10 × $15 + $100 | $250 |
| E. Fill dirt, two loads | 20 | 20 × $15 + 2 × $100 | $500 |
- Order A: loose topsoil weighs about 1,600 lb per yard, and more when wet. Plan half a yard to one yard per trip in a pickup and check the payload on the door-jamb sticker.
- Order B: dividing the $100 trip over 6 yards brings the delivered cost to about $52 a yard.
- Order C: 12 yards of heavy fill may need a large truck or two loads. Ask, and add a second $100 trip if needed ($380).
- Order E: 20 yards takes at least two loads on the trucks above. With cost-guide ranges, the total runs about $200–700.
If a supplier quotes by the ton, convert it: price per yard = price per ton × tons per yard. Cost guides list fill dirt at about $4–15 per ton. Tons here are US short tons of 2,000 lb.
The weight per yard decides the answer. The Caterpillar earthwork tables list loose weights per cubic yard: topsoil about 1,600 lb, loam about 2,100 lb and wet excavated earth about 2,700 lb. Fill dirt isn’t listed on its own, so ask which weight the supplier uses.
At $12 per ton, loam at 2,100 lb (1.05 tons) works out to $12.60 per yard. The same $12 per ton on wet excavated earth at 2,700 lb (1.35 tons) is $16.20 per yard.
A cubic yard is 27 cubic feet, the size of a 3 × 3 × 3 ft cube. It covers 324 sq ft at 1 inch deep, or 108 sq ft at 3 inches (more in what a cubic yard looks like). A yard of dirt weighs roughly 1,600–2,700 lb loose, depending on type and moisture.
Dirt cost per yard FAQ
How much is a dump truck load of dirt?
Cost guides put fill dirt at about $150–400 a load with delivery, for a load described as 10–14 cubic yards. Topsoil runs $150–500 for 10–15 yards. Ask how many yards your load really holds, since heavy dirt can hit a truck’s weight limit before the bed is full.
How much is 10 yards of fill dirt?
Multiply 10 cubic yards by your price per yard and add one delivery. At $15 a yard and $100 delivery, that is about $250. With cost-guide ranges, it runs roughly $100–350. Twenty yards takes at least two loads, about $500 at the same example prices.
How much does half a yard of dirt cost?
Supply yards that sell by the scoop often charge about $10–30 for a half-yard scoop of topsoil you haul yourself. Delivering only half a yard usually costs more than the dirt. Many yards also have a 2-yard delivery minimum.
Are bags of dirt cheaper than a bulk yard?
Rarely, except for a small top-up. A 40 lb bag of topsoil is often 0.75 cubic feet, so 36 bags make a cubic yard; check the volume on the label.
At $2–6 a bag, that comes to about $72–216 a yard. Bulk topsoil runs $10–40 a yard plus delivery. The topsoil calculator compares bags and bulk for your job.
Is dirt removal priced the same as dirt delivery?
No. Hauling dirt away is a separate service, usually priced by the load or by the hour, often with a disposal fee. This page covers buying dirt.